Station 51 construction update 8

      Construction continues at the new Station 51 site on Olive Branch Road despite wet weather that continues to threaten the overall schedule.  Contractors have finished most of the exterior work including siding and trim but the permanent installation of utilities is on hold until drier weather moves in and the ground can be compacted properly.  Most interior walls are now in place with some drywall and insulation being installed.  HVAC, electrical, and plumbing trades are all on site and continue their rough-ins as the site is being readied for permanent exterior door installation.  Once the doors are installed, the structure will be able to be fully heated and drywall can continue in earnest.  Click on the thumbnails below for a pictorial view of the progress.
 

 
 

           

           
(Click on a thumbnail to enlarge photo)

 
 
Links to Previous Updates

  Update 1 - 06-09-06       Update 3 - 08-01-06       Update 5 - 10-03-06       Update 7 - 12-04-06
  Update 2 - 07-01-06       Update 4 - 09-01-06       Update 6 - 11-01-06

    

Construction
Drawings

Front Elevation

Rear Elevation

Lower Level Plan

Main Level Plan
Upper Level Plan

 


©1997-2008 White River Township Fire Department, Inc.  -  All rights reserved

White River Township Fire Department maintains this site ("the Site") for your personal entertainment, information, education, and communication.  Feel free to browse the Site, but please read the terms and conditions before doing so.