Station 51 construction update 4

      After another rain delay, the block masons are back on site and working in earnest.  The two stairwells are beginning to take shape as well as the exterior and interior bay walls.  The plumbing and electrical contractors are both on site as well continuing their rough-ins as needed.  The steel contractor has also been on-site placing much of the structural steel necessary for framing to begin in the coming weeks .  Some photos of the progress are displayed below.
 

 
 

           
(Click on a thumbnail to enlarge photo)

 
 
Links to Previous Updates

  Update 1 - 06-09-06       Update 3 - 08-01-06
  Update 2 - 07-01-06

    

Construction
Drawings

Front Elevation

Rear Elevation

Lower Level Plan

Main Level Plan
Upper Level Plan

 


©1997-2011 White River Township Fire Department, Inc.  -  All rights reserved

White River Township Fire Department maintains this site ("the Site") for your personal entertainment, information, education, and communication.  Feel free to browse the Site, but please read the terms and conditions before doing so.